+971 4 3434 898   info@kad.ae 

AD Port – Contract No. 2201-270 - EPC of KEZAD Gas Network Phase 3, Kezad, Abu Dhabi

The EPC project for KEZAD Gas Network Phase 3, directed towards establishing new facilities, encompasses a wide-ranging scope of activities, including detailed engineering, NOC acquisition, procurement, installation, and commissioning for the identified packages. The scope of work covers, without limitation, crucial components such as Project Management Services, Project Control Services, Site surveys and investigations,  detailed Engineering, Process HSE studies, Procurement of materials and equipment, Offsite pre-fabrication works, on-site installation & Construction, Testing and Commissioning, As-built documentation, Training services, Warranty support services, and the flexibility to accommodate any other work or service imperative for the completion of the Works. The project's specific  scope objectives involved the expansion of  underground gas network at areas KP04,KP08,KP07,KP05 in kezad  having pipeline network from 6 inch to 16 inch along with the FOC network for pipeline leak detection and Data transfer from field to central control room Also scope involved the EPC for Gas Chromatograph package for gas quality monitoring in the gas supply metering system .The gas network expansion involved dewatering, Shoring, NDRC works (both HDD & Open cut), valve pit construction works and Tie-in works from existing facilities  This project underlines a steadfast commitment to excellence, innovation, and comprehensive infrastructure development within the framework of KEZAD Gas Network Phase 3


Gallery