+971 4 3434 898   info@kad.ae 

WASEA/SCT/2012-04 New Fire Station Building and Two ASL Crude Loading Bays for WASEA Bulk Plant

EPC for 2 ASL crude oil loading bays. Scope includes the procurement of special mechanical equipment such as vertical pumps, truck book loading arms, foam skids, MOVs, ZVs, etc. Installation includes 7 km of underground RTR pipe installation and 75,000 inch dia of plant piping welding.

Gallery